A building is not ready for handover until the dust, debris and residue are gone. Planning the final clean early avoids delays on the last day.
What a final clean covers
- Removal of construction debris, packaging and loose materials.
- Dust from walls, ceilings, lights, vents and fittings.
- Paint, cement and adhesive marks on floors, glass and frames.
- Washrooms, kitchens and fixtures cleaned and checked.
- Floors cleaned for the finish they have.
Our post-construction cleaning service follows a checklist agreed before work starts.
Plan it in three steps
- Survey: we visit or review plans to confirm size, finishes and access.
- Phased clean: a rough clean as trades finish, then a detailed final clean.
- Walk-through: check the result with the owner or consultant before handover.
Related work at handover
- Window cleaning and facade cleaning for glass and exteriors.
- High-level cleaning for ceilings, lights and ducts.
- Deep cleaning of villas and apartments before move-in.
- Warehouse cleaning for storage and industrial buildings.
- Pest control before occupancy.