Post-construction cleaning in Duqm: a guide for contractors and owners

By MMT Cleaning Services· 4 min read

A building is not ready for handover until the dust, debris and residue are gone. Planning the final clean early avoids delays on the last day.

What a final clean covers

  • Removal of construction debris, packaging and loose materials.
  • Dust from walls, ceilings, lights, vents and fittings.
  • Paint, cement and adhesive marks on floors, glass and frames.
  • Washrooms, kitchens and fixtures cleaned and checked.
  • Floors cleaned for the finish they have.

Our post-construction cleaning service follows a checklist agreed before work starts.

Plan it in three steps

  1. Survey: we visit or review plans to confirm size, finishes and access.
  2. Phased clean: a rough clean as trades finish, then a detailed final clean.
  3. Walk-through: check the result with the owner or consultant before handover.